US Bridges

Ebl Cunningham Dr. over Route I-64

Fair

Hampton city, Virginia · 0.50COLISUM D/.30TODDS LA · Structure no. 000000000020362

Built
1974
51 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
324 ft
4 main spans
Daily traffic
9,062
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Ebl Cunningham Dr. over Route I-64 is a steel stringer/multi-beam or girder carrying Ebl Cunningham Dr. over Route I-64 in Hampton city, Virginia. It was built in 1974, so it is 51 years old, older than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,062 vehicles a day, roughly 1% of them trucks, projected to reach 13,232 by 2042. The structure is 324 ft (98.8 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesEbl Cunningham Dr.
CrossesRoute I-64
Location0.50COLISUM D/.30TODDS LA
RouteState Highway 152
Coordinates37.04371, -76.39916
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating56.8 US tons
Inventory rating43.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20 + Mod
Structure length324 ft (98.8 m)
Longest span107 ft (32.6 m)
Deck width35 ft (10.7 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,062 (2022)
Projected traffic13,232 by 2042
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$197 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ebl Cunningham Dr. over Route I-64 built?

It was built in 1974, making it 51 years old in 2025.

What condition is Ebl Cunningham Dr. over Route I-64 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Ebl Cunningham Dr. over Route I-64 carry?

About 9,062 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Ebl Cunningham Dr. over Route I-64?

The structure is 324 ft (98.8 m) long with a longest span of 107 ft (32.6 m) and a deck 35 ft wide.

Who owns Ebl Cunningham Dr. over Route I-64?

It is owned by the City or Municipal Highway Agency.