US Bridges

Big Bethel Road over Newmarket Creek

Fair

Hampton city, Virginia · 0.90 to 258/ 0.20BRIARF R · Structure no. 000000000020293

Built
1970
55 years old
Condition
Fair
inspected August 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
80 ft
3 main spans
Daily traffic
7,312
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Big Bethel Road over Newmarket Creek is a prestressed concrete box beam or girders - multiple carrying Big Bethel Road over Newmarket Creek in Hampton city, Virginia. It was built in 1970, so it is 55 years old, older than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,312 vehicles a day, roughly 1% of them trucks, projected to reach 8,153 by 2042. The structure is 80 ft (24.4 m) long and 65 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesBig Bethel Road
CrossesNewmarket Creek
Location0.90 to 258/ 0.20BRIARF R
RouteCity Street 0
Coordinates37.01926, -76.41377
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating26 US tons
Inventory rating16 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans3
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span40 ft (12.2 m)
Deck width65 ft (19.7 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,312 (2022)
Projected traffic8,153 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$700 million (2018 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Big Bethel Road over Newmarket Creek built?

It was built in 1970, making it 55 years old in 2025.

What condition is Big Bethel Road over Newmarket Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Big Bethel Road over Newmarket Creek carry?

About 7,312 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Big Bethel Road over Newmarket Creek?

The structure is 80 ft (24.4 m) long with a longest span of 40 ft (12.2 m) and a deck 65 ft wide.

Who owns Big Bethel Road over Newmarket Creek?

It is owned by the City or Municipal Highway Agency.