US Bridges

WB Dulles Toll Roa over W&od Trail

Fair

Fairfax city, Virginia · 7.2 Miles from Dulles Air · Structure no. 2100043P000000

Built
1984
41 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
170 ft
3 main spans
Daily traffic
22,000
2024 count
Owner
Federal
Metropolitan Washington Airports Service

About this bridge

WB Dulles Toll Roa over W&od Trail is a steel stringer/multi-beam or girder carrying WB Dulles Toll Roa over W&od Trail in Fairfax city, Virginia. It was built in 1984, so it is 41 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 22,000 vehicles a day, projected to reach 26,400 by 2044. The structure is 170 ft (51.7 m) long and 66 ft wide.

CarriesWB Dulles Toll Roa
CrossesW&od Trail
Location7.2 Miles from Dulles Air
RouteState Highway 267
Coordinates38.94492, -77.32623
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating43 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length170 ft (51.7 m)
Longest span57 ft (17.4 m)
Deck width66 ft (20.2 m)
Roadway width63 ft (19.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic22,000 (2024)
Projected traffic26,400 by 2044
Trucks—
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerMetropolitan Washington Airports Service
Maintained byMetropolitan Washington Airports Service
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$236,000 (2021 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was WB Dulles Toll Roa over W&od Trail built?

It was built in 1984, making it 41 years old in 2025.

What condition is WB Dulles Toll Roa over W&od Trail in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does WB Dulles Toll Roa over W&od Trail carry?

About 22,000 vehicles per day (2024 count).

How long is WB Dulles Toll Roa over W&od Trail?

The structure is 170 ft (51.7 m) long with a longest span of 57 ft (17.4 m) and a deck 66 ft wide.

Who owns WB Dulles Toll Roa over W&od Trail?

It is owned by the Metropolitan Washington Airports Service.