South Main Street over Dan River/Ped. Trail
GoodDanville city, Virginia · 1.00-RT. 86 / 0.02-RT. 58 · Structure no. 000000000026216
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected August 2023
- Type
- Arch - Deck
- Prestressed Concrete
- Length
- 821 ft
- 7 main spans
- Daily traffic
- 6,083
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
South Main Street over Dan River/Ped. Trail is a prestressed concrete arch - deck carrying South Main Street over Dan River/Ped. Trail in Danville city, Virginia. It was built in 2005, so it is 20 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,083 vehicles a day, roughly 1% of them trucks, projected to reach 8,881 by 2045. The structure is 821 ft (250.1 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Main Street over Dan River/Ped. Trail built?
It was built in 2005, making it 20 years old in 2025.
What condition is South Main Street over Dan River/Ped. Trail in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does South Main Street over Dan River/Ped. Trail carry?
About 6,083 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is South Main Street over Dan River/Ped. Trail?
The structure is 821 ft (250.1 m) long with a longest span of 122 ft (37.1 m) and a deck 35 ft wide.
Who owns South Main Street over Dan River/Ped. Trail?
It is owned by the City or Municipal Highway Agency.