US Bridges

Nbl Route 168 Byp. over Mount Pleasant Rd.

Fair

Chesapeake city, Virginia · 1.64168 Bus S2.46168 Busn · Structure no. 000000000021894

Built
1981
44 years old
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
141 ft
1 main span
Daily traffic
31,955
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Nbl Route 168 Byp. over Mount Pleasant Rd. is a steel stringer/multi-beam or girder carrying Nbl Route 168 Byp. over Mount Pleasant Rd. in Chesapeake city, Virginia. It was built in 1981, so it is 44 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 31,955 vehicles a day, projected to reach 46,656 by 2042. The structure is 141 ft (43 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesNbl Route 168 Byp.
CrossesMount Pleasant Rd.
Location1.64168 Bus S2.46168 Busn
RouteState Highway 168
Coordinates36.70752, -76.22593
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88 US tons
Inventory rating67.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length141 ft (43 m)
Longest span141 ft (43 m)
Deck width42 ft (12.7 m)
Roadway width38 ft (11.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,955 (2022)
Projected traffic46,656 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Nbl Route 168 Byp. over Mount Pleasant Rd. built?

It was built in 1981, making it 44 years old in 2025.

What condition is Nbl Route 168 Byp. over Mount Pleasant Rd. in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does Nbl Route 168 Byp. over Mount Pleasant Rd. carry?

About 31,955 vehicles per day (2022 count).

How long is Nbl Route 168 Byp. over Mount Pleasant Rd.?

The structure is 141 ft (43 m) long with a longest span of 141 ft (43 m) and a deck 42 ft wide.

Who owns Nbl Route 168 Byp. over Mount Pleasant Rd.?

It is owned by the City or Municipal Highway Agency.