Route 60 (29th St) over Chalk-Mine-Run
FairBuena Vista city, Virginia · 0012ALLEGHANY0023ORCHARD · Structure no. 000000000020069
- Built
- 1938
- 87 years old
- Condition
- Fair
- inspected February 2023
- Type
- Slab
- Concrete
- Length
- 32 ft
- 1 main span
- Daily traffic
- 9,954
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Route 60 (29th St) over Chalk-Mine-Run is a concrete slab carrying Route 60 (29th St) over Chalk-Mine-Run in Buena Vista city, Virginia. It was built in 1938, so it is 87 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,954 vehicles a day, roughly 1% of them trucks, projected to reach 11,099 by 2045. The structure is 32 ft (9.9 m) long and 51 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 60 (29th St) over Chalk-Mine-Run built?
It was built in 1938, making it 87 years old in 2025.
What condition is Route 60 (29th St) over Chalk-Mine-Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.
How much traffic does Route 60 (29th St) over Chalk-Mine-Run carry?
About 9,954 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Route 60 (29th St) over Chalk-Mine-Run?
The structure is 32 ft (9.9 m) long with a longest span of 32 ft (9.9 m) and a deck 51 ft wide.
Who owns Route 60 (29th St) over Chalk-Mine-Run?
It is owned by the City or Municipal Highway Agency.