Fairview St. over Beaver Creek
FairPosted for loadBristol city, Virginia · 0.01VER Ave; 0.40 Mary ST · Structure no. 000000000019974
- Built
- 1930
- 95 years old, rebuilt 2022
- Condition
- Fair
- inspected December 2024
- Type
- Tee Beam
- Concrete
- Length
- 47 ft
- 1 main span
- Daily traffic
- 3,216
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Fairview St. over Beaver Creek is a concrete tee beam carrying Fairview St. over Beaver Creek in Bristol city, Virginia. It was built in 1930 and reconstructed in 2022, so it is 95 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 3,216 vehicles a day, roughly 1% of them trucks, projected to reach 3,586 by 2042. The structure is 47 ft (14.3 m) long and 52 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Fairview St. over Beaver Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 2022.
What condition is Fairview St. over Beaver Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Fairview St. over Beaver Creek carry?
About 3,216 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Fairview St. over Beaver Creek?
The structure is 47 ft (14.3 m) long with a longest span of 47 ft (14.3 m) and a deck 52 ft wide.
Who owns Fairview St. over Beaver Creek?
It is owned by the City or Municipal Highway Agency.