Roda Road over Mud Lick Creek #2
FairWise County, Virginia · .60 to 812 & 1.50 FR 78 · Structure no. 000000000019457
- Built
- 1997
- 28 years old
- Condition
- Fair
- inspected September 2023
- Type
- Slab
- Concrete
- Length
- 56 ft
- 3 main spans
- Daily traffic
- 499
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Roda Road over Mud Lick Creek #2 is a concrete slab carrying Roda Road over Mud Lick Creek #2 in Wise County, Virginia. It was built in 1997, so it is 28 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 499 vehicles a day, roughly 1% of them trucks, projected to reach 729 by 2045. The structure is 56 ft (17.1 m) long and 28 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Roda Road over Mud Lick Creek #2 built?
It was built in 1997, making it 28 years old in 2025.
What condition is Roda Road over Mud Lick Creek #2 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does Roda Road over Mud Lick Creek #2 carry?
About 499 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Roda Road over Mud Lick Creek #2?
The structure is 56 ft (17.1 m) long with a longest span of 28 ft (8.5 m) and a deck 28 ft wide.
Who owns Roda Road over Mud Lick Creek #2?
It is owned by the State Highway Agency.