Exbihit Mine Road over Laurel Creek
FairTazewell County, Virginia · 1.2MFR737; .0MTO644 · Structure no. 000000000018633
- Built
- 1932
- 93 years old, rebuilt 1982
- Condition
- Fair
- inspected July 2024
- Type
- Slab
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 261
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Exbihit Mine Road over Laurel Creek is a concrete slab carrying Exbihit Mine Road over Laurel Creek in Tazewell County, Virginia. It was built in 1932 and reconstructed in 1982, so it is 93 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 261 vehicles a day, roughly 1% of them trucks, projected to reach 392 by 2042. The structure is 26 ft (7.9 m) long and 28 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Exbihit Mine Road over Laurel Creek built?
It was built in 1932, making it 93 years old in 2025. It was reconstructed in 1982.
What condition is Exbihit Mine Road over Laurel Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Exbihit Mine Road over Laurel Creek carry?
About 261 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Exbihit Mine Road over Laurel Creek?
The structure is 26 ft (7.9 m) long with a longest span of 22 ft (6.7 m) and a deck 28 ft wide.
Who owns Exbihit Mine Road over Laurel Creek?
It is owned by the State Highway Agency.