US Bridges

Centreport Pkwy. over I-95

Fair

Stafford County, Virginia · 0.8M RTE1 - 1.2M RTE627 · Structure no. 000000000026190

Built
2005
20 years old
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
600 ft
5 main spans
Daily traffic
6,875
2022 count
Owner
State
State Highway Agency

About this bridge

Centreport Pkwy. over I-95 is a steel stringer/multi-beam or girder carrying Centreport Pkwy. over I-95 in Stafford County, Virginia. It was built in 2005, so it is 20 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,875 vehicles a day, roughly 1% of them trucks, projected to reach 10,038 by 2042. The structure is 600 ft (182.9 m) long and 58 ft wide. If it were closed, the detour would be 8.1 mi (13 km).

CarriesCentreport Pkwy.
CrossesI-95
Location0.8M RTE1 - 1.2M RTE627
RouteCounty Highway 8900
Coordinates38.37506, -77.46333
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.1 US tons
Inventory rating58.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans5
Design loadHS 20 + Mod
Structure length600 ft (182.9 m)
Longest span130 ft (39.6 m)
Deck width58 ft (17.7 m)
Roadway width55 ft (16.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,875 (2022)
Projected traffic10,038 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Centreport Pkwy. over I-95 built?

It was built in 2005, making it 20 years old in 2025.

What condition is Centreport Pkwy. over I-95 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does Centreport Pkwy. over I-95 carry?

About 6,875 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Centreport Pkwy. over I-95?

The structure is 600 ft (182.9 m) long with a longest span of 130 ft (39.6 m) and a deck 58 ft wide.

Who owns Centreport Pkwy. over I-95?

It is owned by the State Highway Agency.