US Bridges

Southamptonpkwyebl over Angelico Creek

Good

Southampton County, Virginia · 8.37 Mi. to Int. Rte. 35 · Structure no. 000000000017731

Built
1990
35 years old
Condition
Good
inspected April 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
167 ft
3 main spans
Daily traffic
7,249
2022 count
Owner
State
State Highway Agency

About this bridge

Southamptonpkwyebl over Angelico Creek is a concrete stringer/multi-beam or girder carrying Southamptonpkwyebl over Angelico Creek in Southampton County, Virginia. It was built in 1990, so it is 35 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,249 vehicles a day, projected to reach 10,584 by 2042. The structure is 167 ft (50.9 m) long and 45 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesSouthamptonpkwyebl
CrossesAngelico Creek
Location8.37 Mi. to Int. Rte. 35
RouteU.S. Route 58
Coordinates36.70214, -77.25094
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106.5 US tons
Inventory rating78.4 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length167 ft (50.9 m)
Longest span55 ft (16.8 m)
Deck width45 ft (13.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,249 (2022)
Projected traffic10,584 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Southamptonpkwyebl over Angelico Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is Southamptonpkwyebl over Angelico Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Southamptonpkwyebl over Angelico Creek carry?

About 7,249 vehicles per day (2022 count).

How long is Southamptonpkwyebl over Angelico Creek?

The structure is 167 ft (50.9 m) long with a longest span of 55 ft (16.8 m) and a deck 45 ft wide.

Who owns Southamptonpkwyebl over Angelico Creek?

It is owned by the State Highway Agency.