I-81 Nbl over NS Railway & Cty Club RD
FairRockingham County, Virginia · 0.24 to 33 - 3.54 to 11 · Structure no. 000000000020465
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 213 ft
- 4 main spans
- Daily traffic
- 26,365
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-81 Nbl over NS Railway & Cty Club RD is a prestressed concrete stringer/multi-beam or girder carrying I-81 Nbl over NS Railway & Cty Club RD in Rockingham County, Virginia. It was built in 1960, so it is 65 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 26,365 vehicles a day, roughly 1% of them trucks, projected to reach 32,428 by 2042. The structure is 213 ft (64.8 m) long and 53 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-81 Nbl over NS Railway & Cty Club RD built?
It was built in 1960, making it 65 years old in 2025.
What condition is I-81 Nbl over NS Railway & Cty Club RD in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does I-81 Nbl over NS Railway & Cty Club RD carry?
About 26,365 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is I-81 Nbl over NS Railway & Cty Club RD?
The structure is 213 ft (64.8 m) long with a longest span of 59 ft (18 m) and a deck 53 ft wide.
Who owns I-81 Nbl over NS Railway & Cty Club RD?
It is owned by the State Highway Agency.