US Bridges

Sbl Route 0081 over Cedar Creek & RTE 692

Fair

Rockbridge County, Virginia · 0.96 - E175 & 3.70 - E180 · Structure no. 000000000015279

Built
1963
62 years old
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
227 ft
3 main spans
Daily traffic
18,708
2022 count
Owner
State
State Highway Agency

About this bridge

Sbl Route 0081 over Cedar Creek & RTE 692 is a steel stringer/multi-beam or girder carrying Sbl Route 0081 over Cedar Creek & RTE 692 in Rockbridge County, Virginia. It was built in 1963, so it is 62 years old, older than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 18,708 vehicles a day, roughly 1% of them trucks, projected to reach 24,651 by 2045. The structure is 227 ft (69.3 m) long and 37 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSbl Route 0081
CrossesCedar Creek & RTE 692
Location0.96 - E175 & 3.70 - E180
RouteInterstate 81
Coordinates37.64016, -79.56238
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69 US tons
Inventory rating53 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length227 ft (69.3 m)
Longest span76 ft (23.2 m)
Deck width37 ft (11.3 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic18,708 (2022)
Projected traffic24,651 by 2045
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$210 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sbl Route 0081 over Cedar Creek & RTE 692 built?

It was built in 1963, making it 62 years old in 2025.

What condition is Sbl Route 0081 over Cedar Creek & RTE 692 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Sbl Route 0081 over Cedar Creek & RTE 692 carry?

About 18,708 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Sbl Route 0081 over Cedar Creek & RTE 692?

The structure is 227 ft (69.3 m) long with a longest span of 76 ft (23.2 m) and a deck 37 ft wide.

Who owns Sbl Route 0081 over Cedar Creek & RTE 692?

It is owned by the State Highway Agency.