US Bridges

Piney Green Road over NS Railway

Fair

Nottoway County, Virginia · .2 FR 460-B & .2 to 625 · Structure no. 000000000012855

Built
1980
45 years old
Condition
Fair
inspected March 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
143 ft
3 main spans
Daily traffic
468
2017 count
Owner
State
State Highway Agency

About this bridge

Piney Green Road over NS Railway is a steel stringer/multi-beam or girder carrying Piney Green Road over NS Railway in Nottoway County, Virginia. It was built in 1980, so it is 45 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 468 vehicles a day, projected to reach 730 by 2042. The structure is 143 ft (43.5 m) long and 30 ft wide. If it were closed, the detour would be 4.3 mi (7 km).

CarriesPiney Green Road
CrossesNS Railway
Location.2 FR 460-B & .2 to 625
RouteCounty Highway 611
Coordinates37.12028, -78.05146
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.4 US tons
Inventory rating66.7 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length143 ft (43.5 m)
Longest span58 ft (17.8 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic468 (2017)
Projected traffic730 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed4.3 mi (7 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Piney Green Road over NS Railway built?

It was built in 1980, making it 45 years old in 2025.

What condition is Piney Green Road over NS Railway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Piney Green Road over NS Railway carry?

About 468 vehicles per day (2017 count).

How long is Piney Green Road over NS Railway?

The structure is 143 ft (43.5 m) long with a longest span of 58 ft (17.8 m) and a deck 30 ft wide.

Who owns Piney Green Road over NS Railway?

It is owned by the State Highway Agency.