Route 421 over Cane Creek
FairLee County, Virginia · 7.0TORT.58; 0.14TORT.58A · Structure no. 000000000010765
- Built
- 1932
- 93 years old
- Condition
- Fair
- inspected February 2025
- Type
- Tee Beam
- Concrete
- Length
- 38 ft
- 1 main span
- Daily traffic
- 5,457
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Route 421 over Cane Creek is a concrete tee beam carrying Route 421 over Cane Creek in Lee County, Virginia. It was built in 1932, so it is 93 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,457 vehicles a day, roughly 1% of them trucks, projected to reach 6,085 by 2045. The structure is 38 ft (11.6 m) long and 26 ft wide. If it were closed, the detour would be 23 mi (37 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 421 over Cane Creek built?
It was built in 1932, making it 93 years old in 2025.
What condition is Route 421 over Cane Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2025.
How much traffic does Route 421 over Cane Creek carry?
About 5,457 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Route 421 over Cane Creek?
The structure is 38 ft (11.6 m) long with a longest span of 36 ft (10.9 m) and a deck 26 ft wide.
Who owns Route 421 over Cane Creek?
It is owned by the State Highway Agency.