US Bridges

Route 60 Ebl over C&o Railroad @ Toano

Fair

James City County, Virginia · 0.11 MI FR Toano · Structure no. 000000000010486

Built
1964
61 years old
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
187 ft
3 main spans
Daily traffic
7,715
2022 count
Owner
State
State Highway Agency

About this bridge

Route 60 Ebl over C&o Railroad @ Toano is a steel stringer/multi-beam or girder carrying Route 60 Ebl over C&o Railroad @ Toano in James City County, Virginia. It was built in 1964, so it is 61 years old, older than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,715 vehicles a day, roughly 1% of them trucks, projected to reach 11,265 by 2045. The structure is 187 ft (57 m) long and 33 ft wide.

CarriesRoute 60 Ebl
CrossesC&o Railroad @ Toano
Location0.11 MI FR Toano
RouteU.S. Route 60
Coordinates37.3854, -76.80554
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.1 US tons
Inventory rating37 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length187 ft (57 m)
Longest span69 ft (21 m)
Deck width33 ft (10.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,715 (2022)
Projected traffic11,265 by 2045
Trucks1%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesRailroad
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening with deck rehabilitation or replacement
Estimated improvement cost$848 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route 60 Ebl over C&o Railroad @ Toano built?

It was built in 1964, making it 61 years old in 2025.

What condition is Route 60 Ebl over C&o Railroad @ Toano in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Route 60 Ebl over C&o Railroad @ Toano carry?

About 7,715 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Route 60 Ebl over C&o Railroad @ Toano?

The structure is 187 ft (57 m) long with a longest span of 69 ft (21 m) and a deck 33 ft wide.

Who owns Route 60 Ebl over C&o Railroad @ Toano?

It is owned by the State Highway Agency.