Ebl Powhite Parkwy over James Rv & CSX Railway
FairHenrico County, Virginia · .56 for Hl Av .66 146 Nbl · Structure no. 000000000021463
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,971 ft
- 18 main spans
- Daily traffic
- 42,730
- 2022 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Ebl Powhite Parkwy over James Rv & CSX Railway is a steel stringer/multi-beam or girder carrying Ebl Powhite Parkwy over James Rv & CSX Railway in Henrico County, Virginia. It was built in 1972, so it is 53 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 42,730 vehicles a day, projected to reach 62,387 by 2045. The structure is 1,971 ft (600.8 m) long and 72 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ebl Powhite Parkwy over James Rv & CSX Railway built?
It was built in 1972, making it 53 years old in 2025.
What condition is Ebl Powhite Parkwy over James Rv & CSX Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Ebl Powhite Parkwy over James Rv & CSX Railway carry?
About 42,730 vehicles per day (2022 count).
How long is Ebl Powhite Parkwy over James Rv & CSX Railway?
The structure is 1,971 ft (600.8 m) long with a longest span of 124 ft (37.8 m) and a deck 72 ft wide.
Who owns Ebl Powhite Parkwy over James Rv & CSX Railway?
It is owned by the Local Toll Authority.