US Bridges

I-95 Nbl Conn over I-295 Nbl

Fair

Henrico County, Virginia · .60 FR 295N .80 to 95N · Structure no. 000000000009850

Built
1980
45 years old
Condition
Fair
inspected November 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
276 ft
3 main spans
Daily traffic
12,317
2022 count
Owner
State
State Highway Agency

About this bridge

I-95 Nbl Conn over I-295 Nbl is a steel continuous stringer/multi-beam or girder carrying I-95 Nbl Conn over I-295 Nbl in Henrico County, Virginia. It was built in 1980, so it is 45 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,317 vehicles a day, projected to reach 17,984 by 2042. The structure is 276 ft (84.2 m) long and 74 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-95 Nbl Conn
CrossesI-295 Nbl
Location.60 FR 295N .80 to 95N
RouteInterstate 95
Coordinates37.6569, -77.4438
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99.9 US tons
Inventory rating99.8 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length276 ft (84.2 m)
Longest span139 ft (42.3 m)
Deck width74 ft (22.5 m)
Roadway width70 ft (21.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,317 (2022)
Projected traffic17,984 by 2042
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 Nbl Conn over I-295 Nbl built?

It was built in 1980, making it 45 years old in 2025.

What condition is I-95 Nbl Conn over I-295 Nbl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does I-95 Nbl Conn over I-295 Nbl carry?

About 12,317 vehicles per day (2022 count).

How long is I-95 Nbl Conn over I-295 Nbl?

The structure is 276 ft (84.2 m) long with a longest span of 139 ft (42.3 m) and a deck 74 ft wide.

Who owns I-95 Nbl Conn over I-295 Nbl?

It is owned by the State Highway Agency.