Va Center Parkway over I-95 & I-95 Conn
FairHenrico County, Virginia · 0.04TELEGR RD0.17F-110 · Structure no. 000000000009622
- Built
- 1980
- 45 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 737 ft
- 4 main spans
- Daily traffic
- 3,605
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Va Center Parkway over I-95 & I-95 Conn is a steel continuous stringer/multi-beam or girder carrying Va Center Parkway over I-95 & I-95 Conn in Henrico County, Virginia. It was built in 1980, so it is 45 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,605 vehicles a day, projected to reach 4,020 by 2045. The structure is 737 ft (224.6 m) long and 86 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Va Center Parkway over I-95 & I-95 Conn built?
It was built in 1980, making it 45 years old in 2025.
What condition is Va Center Parkway over I-95 & I-95 Conn in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Va Center Parkway over I-95 & I-95 Conn carry?
About 3,605 vehicles per day (2022 count).
How long is Va Center Parkway over I-95 & I-95 Conn?
The structure is 737 ft (224.6 m) long with a longest span of 150 ft (45.7 m) and a deck 86 ft wide.
Who owns Va Center Parkway over I-95 & I-95 Conn?
It is owned by the State Highway Agency.