Bill Tuck HWY Ebl over Hyco River
FairHalifax County, Virginia · 0.01 Rt 730 / 0.20 Rt 863 · Structure no. 000000000009159
- Built
- 1955
- 70 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 282 ft
- 5 main spans
- Daily traffic
- 2,587
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Bill Tuck HWY Ebl over Hyco River is a steel stringer/multi-beam or girder carrying Bill Tuck HWY Ebl over Hyco River in Halifax County, Virginia. It was built in 1955, so it is 70 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,587 vehicles a day, roughly 1% of them trucks, projected to reach 3,777 by 2042. The structure is 282 ft (86.1 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bill Tuck HWY Ebl over Hyco River built?
It was built in 1955, making it 70 years old in 2025.
What condition is Bill Tuck HWY Ebl over Hyco River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Bill Tuck HWY Ebl over Hyco River carry?
About 2,587 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Bill Tuck HWY Ebl over Hyco River?
The structure is 282 ft (86.1 m) long with a longest span of 53 ft (16.2 m) and a deck 33 ft wide.
Who owns Bill Tuck HWY Ebl over Hyco River?
It is owned by the State Highway Agency.