Hollyhock Trail over Fountains Creek
FairGreensville County, Virginia · 3.62 MI FR N.C.State Line · Structure no. 000000000009026
- Built
- 1960
- 65 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 281
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Hollyhock Trail over Fountains Creek is a prestressed concrete stringer/multi-beam or girder carrying Hollyhock Trail over Fountains Creek in Greensville County, Virginia. It was built in 1960, so it is 65 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 281 vehicles a day, projected to reach 315 by 2042. The structure is 153 ft (46.7 m) long and 30 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hollyhock Trail over Fountains Creek built?
It was built in 1960, making it 65 years old in 2025.
What condition is Hollyhock Trail over Fountains Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Hollyhock Trail over Fountains Creek carry?
About 281 vehicles per day (2017 count).
How long is Hollyhock Trail over Fountains Creek?
The structure is 153 ft (46.7 m) long with a longest span of 51 ft (15.6 m) and a deck 30 ft wide.
Who owns Hollyhock Trail over Fountains Creek?
It is owned by the State Highway Agency.