Cedar Plains Road over Big Lickinghole Creek
FairPosted for loadGoochland County, Virginia · 2.81 FR 673 & 1.32 to 615 · Structure no. 000000000008623
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 61 ft
- 1 main span
- Daily traffic
- 269
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Cedar Plains Road over Big Lickinghole Creek is a steel stringer/multi-beam or girder carrying Cedar Plains Road over Big Lickinghole Creek in Goochland County, Virginia. It was built in 1994, so it is 31 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 269 vehicles a day, projected to reach 309 by 2042. The structure is 61 ft (18.6 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cedar Plains Road over Big Lickinghole Creek built?
It was built in 1994, making it 31 years old in 2025.
What condition is Cedar Plains Road over Big Lickinghole Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Cedar Plains Road over Big Lickinghole Creek carry?
About 269 vehicles per day (2018 count).
How long is Cedar Plains Road over Big Lickinghole Creek?
The structure is 61 ft (18.6 m) long with a longest span of 58 ft (17.8 m) and a deck 27 ft wide.
Who owns Cedar Plains Road over Big Lickinghole Creek?
It is owned by the State Highway Agency.