Wbl Route 0460 over New River/Ns Railway
FairGiles County, Virginia · 1.89-CL PEMB;2.30-CL Pear · Structure no. 000000000008378
- Built
- 1974
- 51 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,273 ft
- 8 main spans
- Daily traffic
- 7,735
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Wbl Route 0460 over New River/Ns Railway is a steel continuous stringer/multi-beam or girder carrying Wbl Route 0460 over New River/Ns Railway in Giles County, Virginia. It was built in 1974, so it is 51 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,735 vehicles a day, roughly 1% of them trucks, projected to reach 11,295 by 2042. The structure is 1,273 ft (388.1 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wbl Route 0460 over New River/Ns Railway built?
It was built in 1974, making it 51 years old in 2025.
What condition is Wbl Route 0460 over New River/Ns Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Wbl Route 0460 over New River/Ns Railway carry?
About 7,735 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Wbl Route 0460 over New River/Ns Railway?
The structure is 1,273 ft (388.1 m) long with a longest span of 170 ft (51.8 m) and a deck 38 ft wide.
Who owns Wbl Route 0460 over New River/Ns Railway?
It is owned by the State Highway Agency.