Wbl Route 0460 over New River & N&w Railway
FairGiles County, Virginia · 0.96 Pearisbg. 2.94 Narr. · Structure no. 000000000008358
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,320 ft
- 13 main spans
- Daily traffic
- 8,043
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Wbl Route 0460 over New River & N&w Railway is a steel stringer/multi-beam or girder carrying Wbl Route 0460 over New River & N&w Railway in Giles County, Virginia. It was built in 1978, so it is 47 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,043 vehicles a day, roughly 1% of them trucks, projected to reach 11,744 by 2045. The structure is 1,320 ft (402.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wbl Route 0460 over New River & N&w Railway built?
It was built in 1978, making it 47 years old in 2025.
What condition is Wbl Route 0460 over New River & N&w Railway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Wbl Route 0460 over New River & N&w Railway carry?
About 8,043 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Wbl Route 0460 over New River & N&w Railway?
The structure is 1,320 ft (402.4 m) long with a longest span of 130 ft (39.6 m) and a deck 42 ft wide.
Who owns Wbl Route 0460 over New River & N&w Railway?
It is owned by the State Highway Agency.