US Bridges

Ramp H to I95 SB over Fill Material

Good

Fairfax County, Virginia · 00.20FR1/00.50TO95SB · Structure no. 000000000027094

Built
2006
19 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
1,002 ft
17 main spans
Daily traffic
25,000
2005 count
Owner
State
State Highway Agency

About this bridge

Ramp H to I95 SB over Fill Material is a prestressed concrete continuous stringer/multi-beam or girder carrying Ramp H to I95 SB over Fill Material in Fairfax County, Virginia. It was built in 2006, so it is 19 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 25,000 vehicles a day, roughly 2% of them trucks, projected to reach 38,000 by 2042. The structure is 1,002 ft (305.4 m) long and 33 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesRamp H to I95 SB
CrossesFill Material
Location00.20FR1/00.50TO95SB
RouteInterstate 1
Coordinates38.79585, -77.05496
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating83.3 US tons
Inventory rating64.3 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans17
Design loadHS 20
Structure length1,002 ft (305.4 m)
Longest span235 ft (71.6 m)
Deck width33 ft (10.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,000 (2005)
Projected traffic38,000 by 2042
Trucks2%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesOther
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp H to I95 SB over Fill Material built?

It was built in 2006, making it 19 years old in 2025.

What condition is Ramp H to I95 SB over Fill Material in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Ramp H to I95 SB over Fill Material carry?

About 25,000 vehicles per day (2005 count), of which roughly 2% are trucks.

How long is Ramp H to I95 SB over Fill Material?

The structure is 1,002 ft (305.4 m) long with a longest span of 235 ft (71.6 m) and a deck 33 ft wide.

Who owns Ramp H to I95 SB over Fill Material?

It is owned by the State Highway Agency.