US Bridges

Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl

Fair

Chesterfield County, Virginia · 0.05 FR Henrico Cl · Structure no. 000000000027296

Built
2002
23 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
2,372 ft
6 main spans
Daily traffic
357
2022 count
Owner
State
State Highway Agency

About this bridge

Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl is a steel continuous stringer/multi-beam or girder carrying Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl in Chesterfield County, Virginia. It was built in 2002, so it is 23 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 357 vehicles a day, projected to reach 521 by 2042. The structure is 2,372 ft (723 m) long and 33 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesRamp H of 895 Wbl
CrossesRmp a 150 & Dupont_chanl
Location0.05 FR Henrico Cl
RouteInterstate 895
Coordinates37.44248, -77.42422
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating77.1 US tons
Inventory rating46 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans6 (+10 approach)
Design loadHS 20 + Mod
Structure length2,372 ft (723 m)
Longest span188 ft (57.3 m)
Deck width33 ft (10 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic357 (2022)
Projected traffic521 by 2042
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed1.9 mi (3 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byPrivate (other than railroad)
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl built?

It was built in 2002, making it 23 years old in 2025.

What condition is Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl carry?

About 357 vehicles per day (2022 count).

How long is Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl?

The structure is 2,372 ft (723 m) long with a longest span of 188 ft (57.3 m) and a deck 33 ft wide.

Who owns Ramp H of 895 Wbl over Rmp a 150 & Dupont_chanl?

It is owned by the State Highway Agency and maintained by the Private (other than railroad).