Route 0095 over RTE 616 (osborne Rd)
FairChesterfield County, Virginia · .86 FR 10 & .81 to 288 · Structure no. 000000000005055
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 77 ft
- 1 main span
- Daily traffic
- 125,320
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Route 0095 over RTE 616 (osborne Rd) is a steel stringer/multi-beam or girder carrying Route 0095 over RTE 616 (osborne Rd) in Chesterfield County, Virginia. It was built in 1958, so it is 67 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 125,320 vehicles a day, roughly 1% of them trucks, projected to reach 139,732 by 2045. The structure is 77 ft (23.5 m) long and 124 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 0095 over RTE 616 (osborne Rd) built?
It was built in 1958, making it 67 years old in 2025.
What condition is Route 0095 over RTE 616 (osborne Rd) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Route 0095 over RTE 616 (osborne Rd) carry?
About 125,320 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Route 0095 over RTE 616 (osborne Rd)?
The structure is 77 ft (23.5 m) long with a longest span of 72 ft (21.9 m) and a deck 124 ft wide.
Who owns Route 0095 over RTE 616 (osborne Rd)?
It is owned by the State Highway Agency.