US Bridges

Route 83 over Levisa River

Fair

Buchanan County, Virginia · .04 to R460;10.3 to Dcl · Structure no. 000000000023359

Built
1991
34 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
186 ft
3 main spans
Daily traffic
4,322
2022 count
Owner
State
State Highway Agency

About this bridge

Route 83 over Levisa River is a steel stringer/multi-beam or girder carrying Route 83 over Levisa River in Buchanan County, Virginia. It was built in 1991, so it is 34 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 4,322 vehicles a day, roughly 1% of them trucks, projected to reach 4,819 by 2042. The structure is 186 ft (56.7 m) long and 61 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesRoute 83
CrossesLevisa River
Location.04 to R460;10.3 to Dcl
RouteState Highway 83
Coordinates37.23182, -82.09979
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86 US tons
Inventory rating66 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20 + Mod
Structure length186 ft (56.7 m)
Longest span67 ft (20.4 m)
Deck width61 ft (18.6 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,322 (2022)
Projected traffic4,819 by 2042
Trucks1%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Route 83 over Levisa River built?

It was built in 1991, making it 34 years old in 2025.

What condition is Route 83 over Levisa River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Route 83 over Levisa River carry?

About 4,322 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Route 83 over Levisa River?

The structure is 186 ft (56.7 m) long with a longest span of 67 ft (20.4 m) and a deck 61 ft wide.

Who owns Route 83 over Levisa River?

It is owned by the State Highway Agency.