Lithia Road / 640 over Back Creek
FairBotetourt County, Virginia · .01-RTE801W; .08-RTE801E · Structure no. 000000000003438
- Built
- 1961
- 64 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 66 ft
- 1 main span
- Daily traffic
- 238
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Lithia Road / 640 over Back Creek is a steel stringer/multi-beam or girder carrying Lithia Road / 640 over Back Creek in Botetourt County, Virginia. It was built in 1961, so it is 64 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 238 vehicles a day, projected to reach 273 by 2042. The structure is 66 ft (20.1 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lithia Road / 640 over Back Creek built?
It was built in 1961, making it 64 years old in 2025.
What condition is Lithia Road / 640 over Back Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Lithia Road / 640 over Back Creek carry?
About 238 vehicles per day (2016 count).
How long is Lithia Road / 640 over Back Creek?
The structure is 66 ft (20.1 m) long with a longest span of 59 ft (18.1 m) and a deck 29 ft wide.
Who owns Lithia Road / 640 over Back Creek?
It is owned by the State Highway Agency.