Bacova Junction RD over Warm Springs Run
FairBath County, Virginia · 0.94 Rt 679 - 0.15 Rt 39 · Structure no. 000000000002559
- Built
- 1932
- 93 years old
- Condition
- Fair
- inspected March 2024
- Type
- Arch - Deck
- Masonry
- Length
- 27 ft
- 1 main span
- Daily traffic
- 329
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Bacova Junction RD over Warm Springs Run is a masonry arch - deck carrying Bacova Junction RD over Warm Springs Run in Bath County, Virginia. It was built in 1932, so it is 93 years old, older than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 329 vehicles a day, roughly 1% of them trucks, projected to reach 367 by 2045. The structure is 27 ft (8.2 m) long and 39 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bacova Junction RD over Warm Springs Run built?
It was built in 1932, making it 93 years old in 2025.
What condition is Bacova Junction RD over Warm Springs Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Bacova Junction RD over Warm Springs Run carry?
About 329 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Bacova Junction RD over Warm Springs Run?
The structure is 27 ft (8.2 m) long with a longest span of 20 ft (6.1 m) and a deck 39 ft wide.
Who owns Bacova Junction RD over Warm Springs Run?
It is owned by the State Highway Agency.