US Bridges

Ramp "g" over Ramp "r"

Fair

Arlington County, Virginia · 0.2 Miles from Airport Te · Structure no. 2110003P0000000

Built
1992
33 years old
Condition
Fair
inspected February 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
98 ft
1 main span
Daily traffic
5,000
2024 count
Owner
Federal
Metropolitan Washington Airports Service

About this bridge

Ramp "g" over Ramp "r" is a steel stringer/multi-beam or girder carrying Ramp "g" over Ramp "r" in Arlington County, Virginia. It was built in 1992, so it is 33 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,000 vehicles a day, projected to reach 5,500 by 2044. The structure is 98 ft (29.9 m) long and 30 ft wide.

CarriesRamp "g"
CrossesRamp "r"
Location0.2 Miles from Airport Te
Coordinates38.85672, -77.04506
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56 US tons
Inventory rating33 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length98 ft (29.9 m)
Longest span95 ft (29 m)
Deck width30 ft (9.1 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2024)
Projected traffic5,500 by 2044
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerMetropolitan Washington Airports Service
Maintained byMetropolitan Washington Airports Service
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$59,000 (2021 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ramp "g" over Ramp "r" built?

It was built in 1992, making it 33 years old in 2025.

What condition is Ramp "g" over Ramp "r" in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Ramp "g" over Ramp "r" carry?

About 5,000 vehicles per day (2024 count).

How long is Ramp "g" over Ramp "r"?

The structure is 98 ft (29.9 m) long with a longest span of 95 ft (29 m) and a deck 30 ft wide.

Who owns Ramp "g" over Ramp "r"?

It is owned by the Metropolitan Washington Airports Service.