US Bridges

Sbl Route 0395 over Access Road & R R Spur

Fair

Arlington County, Virginia · 0.31FR110 0.42TO14 T Br · Structure no. 000000000000254

Built
1976
49 years old
Condition
Fair
inspected August 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
65 ft
1 main span
Daily traffic
85,416
2022 count
Owner
State
State Highway Agency

About this bridge

Sbl Route 0395 over Access Road & R R Spur is a steel stringer/multi-beam or girder carrying Sbl Route 0395 over Access Road & R R Spur in Arlington County, Virginia. It was built in 1976, so it is 49 years old, younger than the Virginia average of 50.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 85,416 vehicles a day, roughly 1% of them trucks, projected to reach 95,239 by 2045. The structure is 65 ft (19.8 m) long and 92 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesSbl Route 0395
CrossesAccess Road & R R Spur
Location0.31FR110 0.42TO14 T Br
RouteInterstate 395
Coordinates38.86875, -77.04791
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 21 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.4 US tons
Inventory rating48.9 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width92 ft (28 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic85,416 (2022)
Projected traffic95,239 by 2045
Trucks1%
Lanes on structure6
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway and railroad
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$120 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sbl Route 0395 over Access Road & R R Spur built?

It was built in 1976, making it 49 years old in 2025.

What condition is Sbl Route 0395 over Access Road & R R Spur in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Sbl Route 0395 over Access Road & R R Spur carry?

About 85,416 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is Sbl Route 0395 over Access Road & R R Spur?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 92 ft wide.

Who owns Sbl Route 0395 over Access Road & R R Spur?

It is owned by the State Highway Agency.