Sbl Route 0395 over Access Road & R R Spur
FairArlington County, Virginia · 0.31FR110 0.42TO14 T Br · Structure no. 000000000000254
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 65 ft
- 1 main span
- Daily traffic
- 85,416
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sbl Route 0395 over Access Road & R R Spur is a steel stringer/multi-beam or girder carrying Sbl Route 0395 over Access Road & R R Spur in Arlington County, Virginia. It was built in 1976, so it is 49 years old, younger than the Virginia average of 50.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 85,416 vehicles a day, roughly 1% of them trucks, projected to reach 95,239 by 2045. The structure is 65 ft (19.8 m) long and 92 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sbl Route 0395 over Access Road & R R Spur built?
It was built in 1976, making it 49 years old in 2025.
What condition is Sbl Route 0395 over Access Road & R R Spur in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Sbl Route 0395 over Access Road & R R Spur carry?
About 85,416 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Sbl Route 0395 over Access Road & R R Spur?
The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 92 ft wide.
Who owns Sbl Route 0395 over Access Road & R R Spur?
It is owned by the State Highway Agency.