SR-85 Frontage over SR-85 Mainline
GoodUtah County, Utah · SR-85 Frntg SR-85 Main · Structure no. 4F 958
- Built
- 2024
- 1 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 84 ft
- 1 main span
- Daily traffic
- 14,000
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
SR-85 Frontage over SR-85 Mainline is a prestressed concrete stringer/multi-beam or girder carrying SR-85 Frontage over SR-85 Mainline in Utah County, Utah. It was built in 2024, so it is 1 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 14,000 vehicles a day, roughly 20% of them trucks, projected to reach 13,000 by 2043. The structure is 84 ft (25.7 m) long and 71 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-85 Frontage over SR-85 Mainline built?
It was built in 2024, making it 1 years old in 2025.
What condition is SR-85 Frontage over SR-85 Mainline in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does SR-85 Frontage over SR-85 Mainline carry?
About 14,000 vehicles per day (2023 count), of which roughly 20% are trucks.
How long is SR-85 Frontage over SR-85 Mainline?
The structure is 84 ft (25.7 m) long with a longest span of 81 ft (24.8 m) and a deck 71 ft wide.
Who owns SR-85 Frontage over SR-85 Mainline?
It is owned by the State Highway Agency.