US Bridges

SR-68 Redwood Rd. over Ped Trail

Good

Utah County, Utah · 2100 North · Structure no. 0E2724

Built
2019
6 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
26 ft
1 main span
Daily traffic
23,000
2017 count
Owner
State
State Highway Agency

About this bridge

SR-68 Redwood Rd. over Ped Trail is a concrete culvert carrying SR-68 Redwood Rd. over Ped Trail in Utah County, Utah. It was built in 2019, so it is 6 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 23,000 vehicles a day, roughly 18% of them trucks, projected to reach 26,250 by 2034. The structure is 26 ft (7.9 m) long and 178 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesSR-68 Redwood Rd.
CrossesPed Trail
Location2100 North
RouteState Highway 68
StateUtah
Coordinates40.41372, -111.92331
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating106.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length26 ft (7.9 m)
Longest span24 ft (7.4 m)
Deck width178 ft (54.3 m)
Roadway width178 ft (54.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic23,000 (2017)
Projected traffic26,250 by 2034
Trucks18%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-68 Redwood Rd. over Ped Trail built?

It was built in 2019, making it 6 years old in 2025.

What condition is SR-68 Redwood Rd. over Ped Trail in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does SR-68 Redwood Rd. over Ped Trail carry?

About 23,000 vehicles per day (2017 count), of which roughly 18% are trucks.

How long is SR-68 Redwood Rd. over Ped Trail?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.4 m) and a deck 178 ft wide.

Who owns SR-68 Redwood Rd. over Ped Trail?

It is owned by the State Highway Agency.