I-15 (SR-15) Sbl over 400 North Street
FairUtah County, Utah · In Payson · Structure no. 3F 130
- Built
- 1967
- 58 years old, rebuilt 2013
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 139 ft
- 3 main spans
- Daily traffic
- 37,030
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
I-15 (SR-15) Sbl over 400 North Street is a prestressed concrete stringer/multi-beam or girder carrying I-15 (SR-15) Sbl over 400 North Street in Utah County, Utah. It was built in 1967 and reconstructed in 2013, so it is 58 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 37,030 vehicles a day, roughly 26% of them trucks, projected to reach 46,288 by 2034. The structure is 139 ft (42.5 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-15 (SR-15) Sbl over 400 North Street built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2013.
What condition is I-15 (SR-15) Sbl over 400 North Street in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does I-15 (SR-15) Sbl over 400 North Street carry?
About 37,030 vehicles per day (2014 count), of which roughly 26% are trucks.
How long is I-15 (SR-15) Sbl over 400 North Street?
The structure is 139 ft (42.5 m) long with a longest span of 53 ft (16.2 m) and a deck 60 ft wide.
Who owns I-15 (SR-15) Sbl over 400 North Street?
It is owned by the State Highway Agency.