I-15 (SR-15) Sbl over Leland Sugar Factory Rd.
FairUtah County, Utah · 1.7 Mi.Sw.Spanish Fk.Int. · Structure no. 3F 103
- Built
- 1967
- 58 years old, rebuilt 2010
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 138 ft
- 3 main spans
- Daily traffic
- 48,010
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
I-15 (SR-15) Sbl over Leland Sugar Factory Rd. is a prestressed concrete stringer/multi-beam or girder carrying I-15 (SR-15) Sbl over Leland Sugar Factory Rd. in Utah County, Utah. It was built in 1967 and reconstructed in 2010, so it is 58 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 48,010 vehicles a day, roughly 26% of them trucks, projected to reach 60,013 by 2034. The structure is 138 ft (42.1 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-15 (SR-15) Sbl over Leland Sugar Factory Rd. built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2010.
What condition is I-15 (SR-15) Sbl over Leland Sugar Factory Rd. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does I-15 (SR-15) Sbl over Leland Sugar Factory Rd. carry?
About 48,010 vehicles per day (2014 count), of which roughly 26% are trucks.
How long is I-15 (SR-15) Sbl over Leland Sugar Factory Rd.?
The structure is 138 ft (42.1 m) long with a longest span of 59 ft (18 m) and a deck 68 ft wide.
Who owns I-15 (SR-15) Sbl over Leland Sugar Factory Rd.?
It is owned by the State Highway Agency.