I-15 (SR-15) Nbl over Union Pacific Railroad
FairUtah County, Utah · 1.5 MI SW Spanish Fk Int · Structure no. 1F 104
- Built
- 1967
- 58 years old, rebuilt 2010
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 185 ft
- 3 main spans
- Daily traffic
- 48,010
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
I-15 (SR-15) Nbl over Union Pacific Railroad is a prestressed concrete stringer/multi-beam or girder carrying I-15 (SR-15) Nbl over Union Pacific Railroad in Utah County, Utah. It was built in 1967 and reconstructed in 2010, so it is 58 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 48,010 vehicles a day, roughly 26% of them trucks, projected to reach 60,013 by 2034. The structure is 185 ft (56.4 m) long and 67 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-15 (SR-15) Nbl over Union Pacific Railroad built?
It was built in 1967, making it 58 years old in 2025. It was reconstructed in 2010.
What condition is I-15 (SR-15) Nbl over Union Pacific Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does I-15 (SR-15) Nbl over Union Pacific Railroad carry?
About 48,010 vehicles per day (2014 count), of which roughly 26% are trucks.
How long is I-15 (SR-15) Nbl over Union Pacific Railroad?
The structure is 185 ft (56.4 m) long with a longest span of 60 ft (18.3 m) and a deck 67 ft wide.
Who owns I-15 (SR-15) Nbl over Union Pacific Railroad?
It is owned by the State Highway Agency.