US Bridges

Proctor Lane over I-15 (SR-15)

Good

Utah County, Utah · SW Side of Lindon City · Structure no. 0F 813

Built
2011
14 years old
Condition
Good
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
329 ft
3 main spans
Daily traffic
1,010
2023 count
Owner
State
State Highway Agency

About this bridge

Proctor Lane over I-15 (SR-15) is a prestressed concrete continuous stringer/multi-beam or girder carrying Proctor Lane over I-15 (SR-15) in Utah County, Utah. It was built in 2011, so it is 14 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,010 vehicles a day, projected to reach 1,212 by 2043. The structure is 329 ft (100.3 m) long and 69 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesProctor Lane
CrossesI-15 (SR-15)
LocationSW Side of Lindon City
RouteCity Street 2943
StateUtah
Coordinates40.34361, -111.75972
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.4 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length329 ft (100.3 m)
Longest span121 ft (36.9 m)
Deck width69 ft (21 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,010 (2023)
Projected traffic1,212 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Proctor Lane over I-15 (SR-15) built?

It was built in 2011, making it 14 years old in 2025.

What condition is Proctor Lane over I-15 (SR-15) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Proctor Lane over I-15 (SR-15) carry?

About 1,010 vehicles per day (2023 count).

How long is Proctor Lane over I-15 (SR-15)?

The structure is 329 ft (100.3 m) long with a longest span of 121 ft (36.9 m) and a deck 69 ft wide.

Who owns Proctor Lane over I-15 (SR-15)?

It is owned by the State Highway Agency.