US Bridges

Pleasant Gr.Blvd. over I-15 (SR-15)

Fair

Utah County, Utah · At Pleasant Gr.Intchg. · Structure no. 0F 682

Built
2002
23 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
235 ft
2 main spans
Daily traffic
5,000
2012 count
Owner
State
State Highway Agency

About this bridge

Pleasant Gr.Blvd. over I-15 (SR-15) is a prestressed concrete continuous stringer/multi-beam or girder carrying Pleasant Gr.Blvd. over I-15 (SR-15) in Utah County, Utah. It was built in 2002, so it is 23 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,000 vehicles a day, roughly 24% of them trucks, projected to reach 7,000 by 2034. The structure is 235 ft (71.6 m) long and 110 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesPleasant Gr.Blvd.
CrossesI-15 (SR-15)
LocationAt Pleasant Gr.Intchg.
RouteCity Street 2978
StateUtah
Coordinates40.34972, -111.76861
Functional classUrban Other Principal Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.1 US tons
Inventory rating39.2 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length235 ft (71.6 m)
Longest span116 ft (35.3 m)
Deck width110 ft (33.5 m)
Roadway width98 ft (30 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2012)
Projected traffic7,000 by 2034
Trucks24%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pleasant Gr.Blvd. over I-15 (SR-15) built?

It was built in 2002, making it 23 years old in 2025.

What condition is Pleasant Gr.Blvd. over I-15 (SR-15) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Pleasant Gr.Blvd. over I-15 (SR-15) carry?

About 5,000 vehicles per day (2012 count), of which roughly 24% are trucks.

How long is Pleasant Gr.Blvd. over I-15 (SR-15)?

The structure is 235 ft (71.6 m) long with a longest span of 116 ft (35.3 m) and a deck 110 ft wide.

Who owns Pleasant Gr.Blvd. over I-15 (SR-15)?

It is owned by the State Highway Agency.