SR-77 (4th South) over UPRR and Future Ipa Line
FairUtah County, Utah · At 1450 W.On 4th So.St. · Structure no. 0F 769
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 283 ft
- 2 main spans
- Daily traffic
- 29,985
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
SR-77 (4th South) over UPRR and Future Ipa Line is a prestressed concrete continuous stringer/multi-beam or girder carrying SR-77 (4th South) over UPRR and Future Ipa Line in Utah County, Utah. It was built in 2010, so it is 15 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,985 vehicles a day, roughly 25% of them trucks, projected to reach 37,482 by 2034. The structure is 283 ft (86.4 m) long and 107 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-77 (4th South) over UPRR and Future Ipa Line built?
It was built in 2010, making it 15 years old in 2025.
What condition is SR-77 (4th South) over UPRR and Future Ipa Line in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR-77 (4th South) over UPRR and Future Ipa Line carry?
About 29,985 vehicles per day (2014 count), of which roughly 25% are trucks.
How long is SR-77 (4th South) over UPRR and Future Ipa Line?
The structure is 283 ft (86.4 m) long with a longest span of 146 ft (44.5 m) and a deck 107 ft wide.
Who owns SR-77 (4th South) over UPRR and Future Ipa Line?
It is owned by the State Highway Agency.