US Bridges

N 2375 W in Lehi over Waste Ditch Canal

FairPosted for load

Utah County, Utah · 2375 W. 400 N in Lehi · Structure no. 049118E

Built
2022
3 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
500
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

N 2375 W in Lehi over Waste Ditch Canal is a concrete culvert carrying N 2375 W in Lehi over Waste Ditch Canal in Utah County, Utah. It was built in 2022, so it is 3 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 500 vehicles a day, roughly 5% of them trucks, projected to reach 600 by 2040. The structure is 25 ft (7.6 m) long and 55 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN 2375 W in Lehi
CrossesWaste Ditch Canal
Location2375 W. 400 N in Lehi
RouteCity Street 0
StateUtah
Coordinates40.39222, -111.8875
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 23 months
Operating statusPosted for load restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating21.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length25 ft (7.6 m)
Longest span24 ft (7.3 m)
Deck width55 ft (16.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2020)
Projected traffic600 by 2040
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N 2375 W in Lehi over Waste Ditch Canal built?

It was built in 2022, making it 3 years old in 2025.

What condition is N 2375 W in Lehi over Waste Ditch Canal in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does N 2375 W in Lehi over Waste Ditch Canal carry?

About 500 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is N 2375 W in Lehi over Waste Ditch Canal?

The structure is 25 ft (7.6 m) long with a longest span of 24 ft (7.3 m) and a deck 55 ft wide.

Who owns N 2375 W in Lehi over Waste Ditch Canal?

It is owned by the City or Municipal Highway Agency.