SR-194 EB over Jordan River
GoodUtah County, Utah · 1 Mi. W of I-15 Intchg. · Structure no. 2C 979
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected February 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 185 ft
- 1 main span
- Daily traffic
- 5,467
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
SR-194 EB over Jordan River is a steel stringer/multi-beam or girder carrying SR-194 EB over Jordan River in Utah County, Utah. It was built in 2011, so it is 14 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,467 vehicles a day, roughly 18% of them trucks, projected to reach 6,834 by 2032. The structure is 185 ft (56.4 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-194 EB over Jordan River built?
It was built in 2011, making it 14 years old in 2025.
What condition is SR-194 EB over Jordan River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does SR-194 EB over Jordan River carry?
About 5,467 vehicles per day (2012 count), of which roughly 18% are trucks.
How long is SR-194 EB over Jordan River?
The structure is 185 ft (56.4 m) long with a longest span of 182 ft (55.5 m) and a deck 49 ft wide.
Who owns SR-194 EB over Jordan River?
It is owned by the State Highway Agency.