US Bridges

700 East Street over Hobble Creek

Good

Utah County, Utah · 625 S. 700 E. Springville · Structure no. 049070F

Built
1987
38 years old
Condition
Good
inspected October 2023
Type
Tee Beam
Prestressed Concrete
Length
34 ft
1 main span
Daily traffic
767
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

700 East Street over Hobble Creek is a prestressed concrete tee beam carrying 700 East Street over Hobble Creek in Utah County, Utah. It was built in 1987, so it is 38 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 767 vehicles a day, roughly 2% of them trucks, projected to reach 932 by 2033. The structure is 34 ft (10.5 m) long and 56 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries700 East Street
CrossesHobble Creek
Location625 S. 700 E. Springville
RouteCity Street 0
StateUtah
Coordinates40.15781, -111.598
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating52.9 US tons
Inventory rating35.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length34 ft (10.5 m)
Longest span33 ft (10.1 m)
Deck width56 ft (17.1 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic767 (2013)
Projected traffic932 by 2033
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 700 East Street over Hobble Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is 700 East Street over Hobble Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does 700 East Street over Hobble Creek carry?

About 767 vehicles per day (2013 count), of which roughly 2% are trucks.

How long is 700 East Street over Hobble Creek?

The structure is 34 ft (10.5 m) long with a longest span of 33 ft (10.1 m) and a deck 56 ft wide.

Who owns 700 East Street over Hobble Creek?

It is owned by the City or Municipal Highway Agency.