US Bridges

300 East Street over Hobble Creek

Good

Utah County, Utah · 160 S. 300 E. Springville · Structure no. 049015D

Built
1998
27 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
29 ft
1 main span
Daily traffic
945
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

300 East Street over Hobble Creek is a concrete culvert carrying 300 East Street over Hobble Creek in Utah County, Utah. It was built in 1998, so it is 27 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 945 vehicles a day, roughly 2% of them trucks, projected to reach 1,149 by 2033. The structure is 29 ft (8.8 m) long and 61 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries300 East Street
CrossesHobble Creek
Location160 S. 300 E. Springville
RouteCity Street 0
StateUtah
Coordinates40.16411, -111.60503
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert8 Very GoodNo problems noted.
Last inspectionNovember 2023
Inspection intervalevery 23 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating69.7 US tons
Inventory rating69.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length29 ft (8.8 m)
Longest span27 ft (8.1 m)
Deck width61 ft (18.6 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic945 (2013)
Projected traffic1,149 by 2033
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 300 East Street over Hobble Creek built?

It was built in 1998, making it 27 years old in 2025.

What condition is 300 East Street over Hobble Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does 300 East Street over Hobble Creek carry?

About 945 vehicles per day (2013 count), of which roughly 2% are trucks.

How long is 300 East Street over Hobble Creek?

The structure is 29 ft (8.8 m) long with a longest span of 27 ft (8.1 m) and a deck 61 ft wide.

Who owns 300 East Street over Hobble Creek?

It is owned by the City or Municipal Highway Agency.