US Bridges

2900 E.St.In Spvl. over Hobble Creek

Fair

Utah County, Utah · 1300 S.2900 E.Springville · Structure no. 049026F

Built
1985
40 years old
Condition
Fair
inspected October 2023
Type
Tee Beam
Prestressed Concrete
Length
52 ft
1 main span
Daily traffic
693
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

2900 E.St.In Spvl. over Hobble Creek is a prestressed concrete tee beam carrying 2900 E.St.In Spvl. over Hobble Creek in Utah County, Utah. It was built in 1985, so it is 40 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 693 vehicles a day, roughly 4% of them trucks, projected to reach 842 by 2033. The structure is 52 ft (15.7 m) long and 24 ft wide. If it were closed, the detour would be 5 mi (8 km).

Carries2900 E.St.In Spvl.
CrossesHobble Creek
Location1300 S.2900 E.Springville
RouteCity Street 2950
StateUtah
Coordinates40.14883, -111.5555
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating25 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length52 ft (15.7 m)
Longest span48 ft (14.6 m)
Deck width24 ft (7.3 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic693 (2013)
Projected traffic842 by 2033
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 2900 E.St.In Spvl. over Hobble Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is 2900 E.St.In Spvl. over Hobble Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does 2900 E.St.In Spvl. over Hobble Creek carry?

About 693 vehicles per day (2013 count), of which roughly 4% are trucks.

How long is 2900 E.St.In Spvl. over Hobble Creek?

The structure is 52 ft (15.7 m) long with a longest span of 48 ft (14.6 m) and a deck 24 ft wide.

Who owns 2900 E.St.In Spvl. over Hobble Creek?

It is owned by the City or Municipal Highway Agency.