US Bridges

SR-85 (mvc) NB over SR-201

Good

Salt Lake County, Utah · SR-85 NB to SR-201 EB Rmp · Structure no. 1F 915

Built
2021
4 years old
Condition
Good
inspected November 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
74 ft
1 main span
Daily traffic
1,023
2023 count
Owner
State
State Highway Agency

About this bridge

SR-85 (mvc) NB over SR-201 is a prestressed concrete stringer/multi-beam or girder carrying SR-85 (mvc) NB over SR-201 in Salt Lake County, Utah. It was built in 2021, so it is 4 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,023 vehicles a day, roughly 16% of them trucks, projected to reach 1,228 by 2043. The structure is 74 ft (22.5 m) long and 47 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesSR-85 (mvc) NB
CrossesSR-201
LocationSR-85 NB to SR-201 EB Rmp
RouteState Highway 201
StateUtah
Coordinates40.72482, -112.07792
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2022
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length74 ft (22.5 m)
Longest span69 ft (21.1 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,023 (2023)
Projected traffic1,228 by 2043
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR-85 (mvc) NB over SR-201 built?

It was built in 2021, making it 4 years old in 2025.

What condition is SR-85 (mvc) NB over SR-201 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2022.

How much traffic does SR-85 (mvc) NB over SR-201 carry?

About 1,023 vehicles per day (2023 count), of which roughly 16% are trucks.

How long is SR-85 (mvc) NB over SR-201?

The structure is 74 ft (22.5 m) long with a longest span of 69 ft (21.1 m) and a deck 47 ft wide.

Who owns SR-85 (mvc) NB over SR-201?

It is owned by the State Highway Agency.