SR-71 (900E.ST) over I-215 EB and WB
FairSalt Lake County, Utah · 6550 SO.900 East Murray · Structure no. 0C 726
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 392 ft
- 2 main spans
- Daily traffic
- 25,770
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
SR-71 (900E.ST) over I-215 EB and WB is a steel continuous stringer/multi-beam or girder carrying SR-71 (900E.ST) over I-215 EB and WB in Salt Lake County, Utah. It was built in 1984, so it is 41 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,770 vehicles a day, roughly 13% of them trucks, projected to reach 32,213 by 2034. The structure is 392 ft (119.5 m) long and 104 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-71 (900E.ST) over I-215 EB and WB built?
It was built in 1984, making it 41 years old in 2025.
What condition is SR-71 (900E.ST) over I-215 EB and WB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does SR-71 (900E.ST) over I-215 EB and WB carry?
About 25,770 vehicles per day (2014 count), of which roughly 13% are trucks.
How long is SR-71 (900E.ST) over I-215 EB and WB?
The structure is 392 ft (119.5 m) long with a longest span of 224 ft (68.3 m) and a deck 104 ft wide.
Who owns SR-71 (900E.ST) over I-215 EB and WB?
It is owned by the State Highway Agency.