6400 South Street over I-215 (SR-215) Ebl & Wbl
FairSalt Lake County, Utah · 100 West 6400 So Murray · Structure no. 0C 621
- Built
- 1973
- 52 years old
- Condition
- Fair
- inspected October 2024
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 429 ft
- 2 main spans
- Daily traffic
- 7,500
- 2012 count
- Owner
- State
- State Highway Agency
About this bridge
6400 South Street over I-215 (SR-215) Ebl & Wbl is a steel continuous girder and floorbeam system carrying 6400 South Street over I-215 (SR-215) Ebl & Wbl in Salt Lake County, Utah. It was built in 1973, so it is 52 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,500 vehicles a day, projected to reach 10,000 by 2034. The structure is 429 ft (130.8 m) long and 63 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 6400 South Street over I-215 (SR-215) Ebl & Wbl built?
It was built in 1973, making it 52 years old in 2025.
What condition is 6400 South Street over I-215 (SR-215) Ebl & Wbl in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does 6400 South Street over I-215 (SR-215) Ebl & Wbl carry?
About 7,500 vehicles per day (2012 count).
How long is 6400 South Street over I-215 (SR-215) Ebl & Wbl?
The structure is 429 ft (130.8 m) long with a longest span of 217 ft (66.1 m) and a deck 63 ft wide.
Who owns 6400 South Street over I-215 (SR-215) Ebl & Wbl?
It is owned by the State Highway Agency.