Harvest Ln. 7320 S over South Jordan Canal
FairSalt Lake County, Utah · 2235 W. 7320 S. W.Jordan · Structure no. 035210D
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected February 2024
- Type
- Slab
- Concrete
- Length
- 21 ft
- 1 main span
- Daily traffic
- 400
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Harvest Ln. 7320 S over South Jordan Canal is a concrete slab carrying Harvest Ln. 7320 S over South Jordan Canal in Salt Lake County, Utah. It was built in 2010, so it is 15 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 400 vehicles a day, projected to reach 450 by 2030. The structure is 21 ft (6.3 m) long and 53 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Harvest Ln. 7320 S over South Jordan Canal built?
It was built in 2010, making it 15 years old in 2025.
What condition is Harvest Ln. 7320 S over South Jordan Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Harvest Ln. 7320 S over South Jordan Canal carry?
About 400 vehicles per day (2010 count).
How long is Harvest Ln. 7320 S over South Jordan Canal?
The structure is 21 ft (6.3 m) long with a longest span of 19 ft (5.9 m) and a deck 53 ft wide.
Who owns Harvest Ln. 7320 S over South Jordan Canal?
It is owned by the City or Municipal Highway Agency.