US Bridges

1300 East over Parleys Trail

Fair

Salt Lake County, Utah · 1300 E over Parleys Trail · Structure no. 035205E

Built
2014
11 years old
Condition
Fair
inspected December 2023
Type
Culvert
Concrete
Length
28 ft
1 main span
Daily traffic
50,120
2013 count
Owner
City
City or Municipal Highway Agency

About this bridge

1300 East over Parleys Trail is a concrete culvert carrying 1300 East over Parleys Trail in Salt Lake County, Utah. It was built in 2014, so it is 11 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 50,120 vehicles a day, projected to reach 62,650 by 2023. The structure is 28 ft (8.4 m) long and 135 ft wide.

Carries1300 East
CrossesParleys Trail
Location1300 E over Parleys Trail
RouteCity Street 2076
StateUtah
Coordinates40.72451, -111.85382
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating46.4 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length28 ft (8.4 m)
Longest span25 ft (7.5 m)
Deck width135 ft (41.3 m)
Roadway width85 ft (26 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50,120 (2013)
Projected traffic62,650 by 2023
Trucks0%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesHighway
CrossesPedestrian / bicycle
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 1300 East over Parleys Trail built?

It was built in 2014, making it 11 years old in 2025.

What condition is 1300 East over Parleys Trail in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does 1300 East over Parleys Trail carry?

About 50,120 vehicles per day (2013 count).

How long is 1300 East over Parleys Trail?

The structure is 28 ft (8.4 m) long with a longest span of 25 ft (7.5 m) and a deck 135 ft wide.

Who owns 1300 East over Parleys Trail?

It is owned by the City or Municipal Highway Agency.